# Software development for construction industry — from the site to the office.

> BIM interfaces, ERP integration (RIB iTWO, Nemetschek, ALLPLAN) and construction progress tracking: automate processes between site and back office.

Documentation and review between site and office. Interfaces to ERP or BIM, for example RIB iTWO, Nemetschek or ALLPLAN, are possible integrations and do not describe the Montron systems.


## Three problems from construction projects

- ERP integration is patchwork: RIB iTWO, Nemetschek and others do not all speak the same language. Data breaks at interfaces.
- Construction progress captured manually: Foremen with clipboards, evening data entry. No current picture of progress.
- Subcontractor workflows in email: Commissioning, acceptance, complaints — all email chains without status.

## Possible integrations

- Subcontractor documents with a status: Commissioning, acceptance and complaints can carry a status, instead of running only as an email chain. That is a possible path, not part of the Montron systems.
- ERP integration: Possible interfaces to RIB iTWO, Nemetschek, ALLPLAN or SAP, via REST or database replication. This does not describe the Montron systems.
- BIM data: IFC and BCF can be processed and linked to ERP master data. That is a possible building block, not part of the Montron systems.

## Typical scenario

- Hand a plan status to an ERP: One example: IFC or BCF data can go to an ERP through an existing interface, for example RIB iTWO, Nemetschek or ALLPLAN. Which fields arrive depends on that interface.


## Relevant links

- [HTML version](https://monadion.com/en/branchen/bau)
- [English overview (llms.txt)](https://monadion.com/en/llms.txt)
- [Full AI context](https://monadion.com/en/llms-full.txt)
- [Book an analysis call](https://monadion.com/en/booking)
- [Contact](https://monadion.com/en/contact)

## Related

- [Industries overview](https://monadion.com/en/branchen.md)
- [Services](https://monadion.com/en/services.md)
